Control of the amount of rock fed into the mill circuit at Urad Mine was controlled by four slusher drifts such as the one shown here
Editing is temporarily disabled
Cancel EditAMAX, Inc., Control of the amount of rock fed into the mill circuit at Urad Mine was controlled by four slusher drifts such as the one shown here. Denver Public Library Digital Collections, accessed 20/03/2025, https://digital.denverlibrary.org/nodes/view/1068470